1/2
FIEO Registered FIEO Registered Export Ready

Scaffolding Top Cup Forged

Sold by kuber international · Exporter, Merchant · Ludhiana, Punjab, India

Price
Price on request
In stock
Inclusive of all taxes
Minimum order: 1 unit

Export Snapshot

MOQ
1 unit
Lead time
2-4 weeks handling time
Packaging
Bulk shipments FOB Indian sea port
Shelf life / longevity
As per product specification
HS Code
73084000
Origin
India
Port of dispatch
On request
Export markets served
Global markets
Values shown are for kuber international.
Compliance & Certifications
RCMC
Suitable for

Importers · Distributors · Wholesalers

Know your supplier

kuber international is a Exporter, Merchant based in Ludhiana Punjab India.

Ludhiana 2-4 weeks handling time FIEO member
kuber international logo

Exporter, Merchant · Ludhiana, Punjab, India

Merchant Exporter of Plastic Processing Machines, Food Processing Machines, Packaging Machines, Packaging Material, Printing Machinery, Mould & Dies.

Registered address: Ludhiana, India. Industry: Rubber, Plastics & Polymers > Plastic, Rubber Machinery & Machinery Parts.

Established
1998
Employees
1–10
GST
03ACNPR2556D1ZO
IEC code
3098006595
Export markets
Global markets
GlobalLinker Member Since
Dec 2018
Turnover
2500001 - 10000000.
Incorporation Type
On request
Product details

What are the specifications of this product?

Overview

The Scaffolding Top Cup (Forged Type) is a vital component of the Cuplock scaffolding system, engineered to provide superior strength, durability, and reliability in heavy-duty construction applications. Manufactured from high-quality forged steel, the top cup is designed to securely hold horizontal ledgers in place, ensuring structural stability and quick assembly.Key Features:Material: Drop-forged steel for enhanced strength and impact resistanceDesign: Precision-forged for a tight, secure fit with scaffolding standardsSize Compatibility: Suitable for 48.3mm diameter vertical standards (or customized upon request)Surface Finish: electro galvanized, or natural surface finish.Application: Used in Cuplock scaffolding systems to lock ledgers and transoms at node pointsBenefits:Ensures fast and secure scaffolding assemblyWithstands heavy loads and tough site conditionsLong service life due to durable forging processEasy to install and remove, improving worksite efficiencyThis forged top cup is ideal for use in construction, maintenance, and infrastructure projects, where safety and performance are critical.Price: FOB Indian sea port. Add sea freight, as applicableHanding Time: 2-4 weeks

Product Description

The Scaffolding Top Cup (Forged Type) is a vital component of the Cuplock scaffolding system, engineered to provide superior strength, durability, and reliability in heavy-duty construction applications. Manufactured from high-quality forged steel, the top cup is designed to securely hold horizontal ledgers in place, ensuring structural stability and quick assembly.


Key Features:

Material: Drop-forged steel for enhanced strength and impact resistance


Design: Precision-forged for a tight, secure fit with scaffolding standards


Size Compatibility: Suitable for 48.3mm diameter vertical standards (or customized upon request)


Surface Finish: electro galvanized, or natural surface finish.


Application: Used in Cuplock scaffolding systems to lock ledgers and transoms at node points


Benefits:


Ensures fast and secure scaffolding assembly


Withstands heavy loads and tough site conditions


Long service life due to durable forging process


Easy to install and remove, improving worksite efficiency


This forged top cup is ideal for use in construction, maintenance, and infrastructure projects, where safety and performance are critical.


Price: FOB Indian sea port. Add sea freight, as applicable
Handing Time: 2-4 weeks

Description provided by kuber international.

Specifications

Material Type Drop-Forged Steel
Compatibility Size 48.3 mm Diameter Vertical Standards
Finish Type Electro Galvanized or Natural Steel Finish
Use Case For Cuplock scaffolding systems to lock horizontal ledgers and transoms
Load Bearing Suitable for heavy-duty construction site loads
Manufacturing Process Drop Forging with precision engineering
Packaging Bulk shipments FOB Indian sea port
Lead Time 2-4 weeks handling time
Customization Available on request for size compatibility

Use cases

Category Construction & Building Materials > Scaffolding > Cuplock Scaffolding Components
Primary application Wholesale, distribution, and international sourcing
Brand Not specified
Product type Product

Logistics & handling

Lead time 2-4 weeks handling time
Packaging Bulk shipments FOB Indian sea port
Storage condition As recommended by supplier
Origin India
Form As listed by supplier

Commercials (this seller)

Minimum order 1 unit
Lead time 2-4 weeks handling time
Payment terms As per negotiated commercial agreement.
Checkout type enquiry
Buyer questions

Frequently asked by buyers

Common questions B2B buyers ask before sourcing Scaffolding Top Cup Forged. Answers compiled from verified sellers' commercial terms and platform data.

Q: What is the maximum load capacity supported by the Scaffolding Top Cup Forged?
A: While the exact load capacity depends on the overall scaffolding configuration, the forged steel construction ensures it can withstand the heavy loads typical in Cuplock scaffolding systems used for construction and infrastructure projects.
Q: Can the Scaffolding Top Cup Forged be customized for different vertical standard diameters?
A: Yes, although it is standard for 48.3mm vertical standards, custom sizes can be manufactured upon request to fit different scaffolding requirements.
Q: What are the benefits of choosing a forged top cup over cast or pressed options?
A: Forged top cups provide superior strength, durability, and impact resistance compared to cast or pressed parts, resulting in better safety margins and longer service life in demanding construction conditions.
Q: Is the electro galvanized finish corrosion resistant enough for coastal construction sites?
A: Yes, the electro galvanized surface treatment significantly enhances corrosion resistance, making the top cup suitable for coastal and harsh environmental conditions, thereby extending its lifespan.
Q: What is the typical lead time and shipping terms for bulk orders of this product?
A: The standard handling time is 2-4 weeks with FOB Indian seaport terms. Sea freight costs are additional, and bulk orders may be coordinated for faster delivery upon inquiry.
Question not answered? Ask sellers directly — typical response within 4 hours.
Scaffolding Top Cup Forged
Scaffolding Top Cup Forged
Price on request · MOQ 1unit